Annual Parking Lot Rehabilitation 2025 thru 2029 Capital Improvement Plan Shakopee, MN Project # PA-26-01 Project Name
Annual Parking Lot Rehabilitation
Total Project Cost
$505,000
Contact
City Engineer
Department
Park Asset Internal Serv. Fund
Type
Improvement
Category
Public Works
Priority
2 - Smart to do
Status
Active
Useful Life
25 years
Fund
Park Asset IS Fund
Project Code
PA2403
Description
Project includes the rehabilitation of the bituminous asphalt surfaces. The rehabilitation work includes removal of the pavement surface, full depth spot repair and patching, spot curb and gutter repair, upgrade of sidewalk/trail/pedestrian curb ramp, meet ADA requirements and a bituminous pavement reconstruction.
2026 - Downtown Fuller/2nd Ave parking lot
2027 - O'Dowd parking lot
2028 - Tahpah West parking lot
2028 - Riverview parking lot
Justification
This is a continuation of the city's pavement preservation program to maintain existing infrastructure. The city must also reconstruct pedestrian ramp facilities with ADA transition plan adopted in 2018.
Expenditures
2025
2026 99,000 11,000 110,000
2027 72,000
2028
2029
Total
460,000 45,000 505,000
Improvements
0 0 0
289,000 26,000 315,000
0 0 0
Engineering/Administration
8,000
Total
80,000
Funding Sources
2025
2026
2027 80,000 80,000
2028
2029
Total
505,000 505,000
Park Asset Internal Service Fund
0 0
110,000 110,000
315,000 315,000
0 0
Total
Budget Impact The bituminous pavements in the project area have significantly deteriorated. Patching or overlayment are no longer effective options to extend the life of the asphalt surface. These pavement areas require more than usual maintenance. Update the lighting, repair curbing, and required ADA improvements are generally unfunded mandates to improve accessibility and minimize liability.