2022-2026 Capital Improvement Plan (Final)

thru 2022 2026

Capital Improvement Plan City of Shakopee, Minnesota

Department Storm Drainage Fund

Contact Public Works Director

Type Improvement

Project #

Storm-24-001

Useful Life

Project Name Blue Lake Channel (West) Regional Storm Pond

Category Storm Sewer/Drainage

Priority 2 Important-Provide Efficienci

Accounting Code

Status Active

Fund Surface Water Fund

Description Regional best management practice located west of CSAH 83 to implement for rate control, flood protection, and water quality. Total Project Cost: $750,000

Justification It is important to control rates to manage the stormwater system and protect/reduce the potential for flooding in the downstream stormwater system. It may also provide water quality benefit by reducing sediment and phosphorus to help meet water quality goals and NPDES MS4 requirements.

Expenditures

Total

2022

2023

2024

2025

2026

Construction/Maintenance

675,000

675,000

Engineering/Administration

75,000

75,000

750,000

750,000

Total

Funding Sources

Total

2022

2023

2024

2025

2026

Grants

375,000

375,000

Storm Drainage Fund

375,000

375,000

750,000

750,000

Total

Budget Impact/Other Construction of ponding would be done with development. A feasibility study that evaluated flooding was completed by WSB in 2014. An AUAR for this area is being completed by Stantec.A feasibility study by Barr funded through WBF will analyze water quality benefit.

241

Made with FlippingBook - Online catalogs