2024-28 Capital Improvement Plan
thru 2024 2028
Capital Improvement Plan City of Shakopee, Minnesota
Storm Drainage Fund
Department
Public Works Director
Contact
Improvement
Type
Project #
Storm-25-003
Useful Life
Project Name Blue Lake Channel (West) Regional Storm Pond
Storm Sewer/Drainage
Category
2 Important-Provide Efficienci
Priority
Accounting Code
Project Code
Active
Status
Fund Surface Water Fund
Description Regional best management practice located west of CSAH 83 to implement for rate control, flood protection, and water quality. Total Project Cost: $700,000
Justification It is important to control rates to manage the stormwater system and protect/reduce the potential for flooding in the downstream stormwater system. It also provides water quality benefit by reducing sediment and phosphorus to help meet water quality goals and NPDES MS4 requirements.
Expenditures
Total
2024
2025
2026
2027
2028
Construction/Maintenance
610,000
610,000
Engineering/Administration
90,000
90,000
700,000
700,000
Total
Funding Sources
Total
2024
2025
2026
2027
2028
Storm Drainage Fund
700,000
700,000
700,000
700,000
Total
Budget Impact/Other Construction of ponding would be done with development. A feasibility study that evaluated flooding was completed by WSB in 2014. An AUAR was completed by Stantec for this area. A feasibility study by Stantec partially funded through WBF was completed to determine if there is a water quality benefit opportunity with oversizing. The study did identify that there are opportunities with water quality benefits.