2021 City of Shakopee Fee Schedule
City of Shakopee | 485 Gorman St., Shakopee MN 55379 | City Clerk’s Office 952-233-9300 | Fax: 952-233-3801 | www.ShakopeeMN.gov
Residential Existing Fees
• • • • • • • •
Garages/Basement Finishes/Additions/Solar Existing one- or two-family home renovation Reconnection to existing circuit or feeder
$70
$175
$35 $35 $35 $35 $35 $70
Inspection of grounding electrode
Radon system
Furnace/air conditioner replacement
Service panel Swimming pool
Miscellaneous Residential Fees
• •
Extra trip charge or failure
$35
State surcharge
.0005 x total job valuation, or $1 minimum
Commercial Fees
Job Valuation
Fees
$1 to $1,300
$56
$1,301 to $5,000
$56 + .025 x (valuation - $1,300)
$5,001 to $10,000
$162 + .024 x (valuation - $5,000)
$10,001 to $25,000
$297.50 + .023 x (valuation - $10,000)
$25,001 to $50,000
$651 + .021 x (valuation - $25,000)
$50,001 and over
$1,186.50 + .02 x (valuation - $50,000)
• • • • • • • • • •
Transformer rated up to 10KVA Transformer rated in excess of 10KVA Manufactured home/RV supply
$15/transformer $30/transformer
$35/pedestal $10/circuit $5/standard
RV pedestals
Street, parking lot, outdoor, traffic standards Power supplies for signs and outline lighting
$10/power supply
Trip charge
$56
Commercial event
$56 trip/ride
Generators
$56
State surcharge
.0005 x total job valuation, or $1 minimum
NEW CONSTRUCTION FEES Plumbing Permits (City Code 111.04)
New construction residential (Ordnance 659)
$175 + $1 state surcharge
Sewer and water connection – Single Residential Sewer connection Water connection Combination water and sewer connection
$80 + $1 state surcharge
Sewer and/or water connection – Multiple Residential
2.5% of contract price or $100 minimum + state surcharge
Sewer and/or water connection – Commercial/Industrial
2.5% of contract price or $100 minimum + state surcharge
2021 City of Shakopee Fee Schedule – v1.1.21
Page 18 of 3 3
Made with FlippingBook - professional solution for displaying marketing and sales documents online